top of page

UOG Central Administration Building (Design Stage)


This building is designed to meet the needs of both students and staff members, creating a more peaceful and quiet environment as well as providing public amenities and services beyond the PPR-1990 requirements. It presents an exciting and commercially viable & sustainable development for the town of Goroka.

Project Details:

Status: Design stage

Location: Goroka, Eastern Highlands Province, Papua New Guinea

Site: Situated at the north-eastern extent of the Goroka Township. The site area is 2,500m2

Design: Built to have 6 levels starting from the basement, ground floor and all the way to the fourth floor. Also contains an elevator and a parking space for 12 cars

Total area: 5,358.28m2

Client: University of Goroka

Featured Posts
Projects List
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Instagram Social Icon
  • Pinterest Social Icon
bottom of page